David Evans and Associates
Author
Pub. Date
2007.
Description
This report documents the development and analysis of alternatives for improvement of the Arapahoe Road (SH 88) Corridor from I-25 to Parker Road (SH 83) in compliance with the Colorado Department of Transportation (CDOT) Policy Directive 1601 Interchange Approval Process.
Author
Pub. Date
2008.
Description
This report documents the information required for the I-25 and Arapahoe Road Interchange System Feasibility Study, in compliance with the Colorado Department of Transportation (CDOT) Policy Directive 1601 Interchange Approval Process. This document will be used by CDOT to evaluate the interchange improvements request. Arapahoe Road (SH 88) is located in the southern portion of the Denver Tech Center and serves as a key east-west regional roadway...
Pub. Date
2017.
Description
The C-470, US 6, and CO 93 highways along the western edge of the Denver metropolitan area create an important regional highway corridor, the WestConnect corridor, providing transportation connectivity between southern Jefferson County and Boulder County. The WestConnect corridor provides regional mobility for the growing suburban communities and serves as an important connection for recreational travel and a commuter route for area residents and...
Pub. Date
2013.
Description
The Colorado Department of Transportation (CDOT) initiated a Planning and Environmental Linkages (PEL) Study to develop a range of improvements to reduce congestion and improve operations and safety at the I-70 and Kipling Street interchange. A thorough and inclusive technical and public process helped to identify and screen a wide range of improvement alternatives.